When contractors carry out AMP8 upgrades, parts of a treatment works are often taken out of service while the site keeps treating wastewater. This can lower the oxygen levels the treatment process relies on, so temporary aeration is needed to maintain required dissolved oxygen levels.

WHAT IS AMP8?
AMP8 (Asset Management Plan 8) is the five-year investment period for water and sewerage companies in England and Wales, running from 2025 to 2030. It sets out how much each company can spend improving its networks, treatment works and environmental performance. In England alone, companies have a record £91.95 billion to invest over this period, with more than £50 billion focused on wastewater. This investment will fund improvements to treatment works and sewer networks, helping to protect rivers, coasts and the wider environment. For site teams, it also means a busy programme of works that must be delivered while treatment continues, making careful planning and reliable support more important than ever.
WHAT CHALLENGES COULD BE FACED WHEN UPGRADING INFRASTRUCTURE?
A wastewater treatment works can't simply close while it's being upgraded. Wastewater keeps arriving every hour of the day, so the site must keep treating it while major parts of the process are shut down, emptied or rebuilt.
During AMP8 works, this often means aeration assets are taken out of service for weeks or even months. The rest of the site then must handle the same flow with less treatment capacity. Without enough aeration, oxygen levels can drop, treatment performance can suffer and the site may struggle to meet its environmental permit.
Problems can also arise without warning. Equipment that's being worked on may fail, a planned shutdown may run longer than expected, or heavy rainfall may bring higher flows at the wrong moment.
That's why planning ahead matters. Deciding on a temporary aeration solution before the works begin means equipment, power and access are already arranged.
why is aeration so important in wastewater treatment?
Aeration is one of the most important stages of wastewater treatment. It supplies the oxygen that naturally occurring bacteria need to break down waste and clean the water before it is returned to rivers and seas. Without enough oxygen, these bacteria struggle, treatment performance can decline quickly and the site risks falling short of its environmental permit.
When aeration lanes or tanks are taken out of service during upgrade works, temporary aeration keeps oxygen levels where the treatment process needs them. Without it, the remaining capacity may struggle to cope, putting performance and compliance at risk. Reliable and efficient temporary aeration helps treatment works stay compliant, protect the environment and keep operating with confidence, even during planned maintenance or major upgrade works.
"

HOW CAN A SPIRAL AERATOR support treatment during amp8 upgrades?
Spiral Aerators are particularly well suited to temporary aeration because they are designed to work around existing site operations. Their floating, self-aspirating design delivers aeration and mixing from a single unit, with no need for separate blowers or compressors. They can be lifted into aeration lanes, oxidation ditches and lagoons with minimal disruption, then relocated just as easily as site requirements change. With no gearbox, no oil and an anti-rag impeller, they need very little attention once running, allowing site teams and contractors to stay focused on the upgrade itself.
Spiral Aerators combine fine bubble aeration with a powerful horizontal flow. This spreads oxygen through the water and keeps it moving, so the treatment process continues while permanent equipment is offline. They also run quietly, without splashing or releasing bio-aerosols, which helps on busy sites where contractors are working nearby.
what are the benefits of using spiral aerators for amp8 projects?
- Easy to deploy or relocate.
- Aeration and mixing all-in-one unit.
- Little to no regular maintenance required.
- Flexible hire durations to fit your dynamic project.
- Plug-and-play (no commissioning).
CASE STUDY: TEMPORARY EMERGENCY WASTEWATER AERATION
For contractors delivering AMP8 upgrades, keeping a treatment works compliant while assets are offline should be planned from the start, not left until a lane or tank is shut down. In this case study, operational leaders from Severn Trent, Anglian Water and United Utilities explain how Corgin restored aeration when it was lost at their sites.
Corgin arrived on site within hours and installed temporary Spiral Aerators, run off sites control philosophy, while reducing the need for costly alternatives such as crane hire. By agreeing temporary aeration requirements, contractors can take lanes, tanks and blowers offline with confidence that treatment will stay on track.
CARRYING OUT AMP8 WORKS?
If your upgrade programme means taking aeration lanes, tanks or equipment out of service, Corgin can help keep treatment on track while the work goes ahead. With the UK's largest fleet of floating aerators and mixers, we can support planned upgrades and unexpected setbacks. Our team will assess your site, agree the right approach and have temporary aeration ready when you need it, so your project can move forward with confidence and peace of mind.